90% done, but oh, that last damn 10%!!!
Tuesday, December 30, 2008
Wednesday, December 24, 2008
Setup continues - full fitting studio ready
A few more deliveries yesterday (all the Juteau Cantin fitting tools), trainers are set (6 mag trainers and 3 computrainer lab units) and so all that I really have to do is build the change area beside the bike gear cubbies at the back of this picture. That and catch up on all the things that have either gone wrong (accounting software failure, need to re-receive) or that clean the place up (a few lights and some cabling).
Closed the 24th and 25th, back at it 12-8 the 26th and 27th. Indoor Cycle training begins on January 3 (http://www.hellovelo.ca/docs/iCYCLEJan09.pdf).
Friday, December 19, 2008
Ongoing cleaning project
The cleanup of the SRAM Red groupset from my racing bike continues; this time 2 times of concern.


Is the crankset rideable with a bad bottom bracket and busted chainring? Yes, but this is definitely not ideal.
Wednesday, December 17, 2008
New stuff
At the end of every night I try to do a little something that makes me feel great. With new items arriving every day and all the minor rennovations that are going an, a day can go by without even touching a bike. So last night I continued my clean up work on the group set that came of the BMC I just sold. Dental pick? Yep, removing the factory applied loctite.
New saddles from Louis Garneau came in, Men's and Women's Airstream 3. Under 300 grams and the holes go all the way through the saddle body and top, and if you wear LG's shorts with Airgel Chamois you'll get cooling all the way through to your bottom. Should be great for the dog days of summer. And both match the 2009 DH Flyers Team Kit.
Friday, December 12, 2008
2 Days of Rest
Thursday, December 11, 2008
Power cranks - Paul
So umm, here is how I did on my first ride.
What was most noticeable was that I have a significant dead spot on the left side, just after passing through the bottom dead centre of the pedal circle.
p.
Wednesday, December 10, 2008
Wednesday update



The fit bike is also all hooked up to the computrainer and ready either to find your fit coordinates, fix your pedal stroke with the Powercranks or to be used to take your graded and maximal power output (measure your fitness now and track your development over the season). Elite and Junior racers, I'll be calling you in next week to work on your positioning.
The sign is painted, but not yet mounted - I still need to install the bench lighting and run the wires. Schwalbe Ultremo R tires came in as well; too bad about the ice otherwise I'd be out there giving them a try.
Tuesday, December 9, 2008
Powercranks and the shop moves forward
Saturday, December 6, 2008
80% done, open Tuesday
Melanie was here in the morning (to discover the over flowing toilet and centimetre of water on the floor) and made quick work of a very curvy logo. What a great job! I'll paint it red next week and hang it over the work benches.
So what's available on Tuesday? Spring bike pre-orders and time trial sizing, Schwalbe tires, Pro and Shimano components, GIFT CERTIFICATES for Christmas for winter training or mechanic classes, tune-ups, winter bike wheel rebuilds, and the best chain lube out there.
Grand opening in January, but I am here for the next couple weeks from 12-6 Tuesday to Saturday.
Thursday, December 4, 2008
Getting closer - open next Tuesday
I got the fitting and testing bike together (centre of picture) with the help of Emile, sorted through the tools and mopped 1/3 of the shop floor (I had one of those, how many times will I have to do this?? moments).
The shop/studio is really shaping up and if I am lucky, the super will drop off paint tonight or tomorrow and enough people will drop by to do a little painting on Friday. If there is no paint it'll be more of a pizza and drinks party (which ain't too bad).
I am off to instruct fitting to the next class of mechanics on Monday at the Winterborne Bike Institute so Tuesday I'll be open, working on bikes and planning the mechanic and training courses. More news about the team and club to follow as well.
You can drop by tomorrow (Friday the 5th at 6PM) if you want to check it out.
Tuesday, December 2, 2008
Getting closer to opening
I am getting down to bits and pieces, waiting for deliveries and doing the final touches. Still a fair amount of cleaning to do and the super hasn't fixed the window sill yet, but I should be operational by Tuesday morning.
Tomorrow will be the last day of running around, some of the final cuts as well as sourcing the parts I need to put the fit/training bike together.
p.
Subscribe to:
Posts (Atom)